SFH-280-850 Dr. Troootzi denkt über Formen der Öffentlichkeitsarbeit nach . Ein eindrucksvolles Beispiel: Walnut Creek, Kalifornien. Die Frage lautet: Kann ein solches Modell auch auf Investitonen in den Lärmschutz in Österreich angewandt werden? . http://www.walnut-creek.org/government/city-clerk/public-meetings-video-audio . Beispiel 1: Walnut Creek
How to watch City Council and Commission meetings.
When meetings are in session:
On the computer: When meetings are in session, they will be streamed live on the player that appears on this webpage.
On TV: Go to » walnutcreektv.org for channel info, or check your cable listings.
When meetings are over:
Video of past meetings are archived below. Meetings are arranged by date, with the most recent at the top of the list. Click Video to listen to the meeting and view agenda documents, or Agenda or Minutes to see just the documents. You can also search the archives by typing keywords into the Search box.
The minimum system requirements for watching the Archived video » are available here.
For questions about videos of Public Meetings, please contact the City Clerk's office at 925-943-5895.
Currently in Session |
If a meeting is currently in session, it will be available here. |
No meetings are currently in session. |
Upcoming Meetings and Events
Design Review Commission |
August 17, 2016 - 7:00 pm |
» Agenda |
|
Oversight Board Meeting |
September 14, 2016 - 09:00am |
|
|
Transportation Commission |
September 15, 2016 - 6:00 pm |
|
|
PROS Commission |
October 3, 2016 - 7:00 pm |
|
|
Archived Minutes / Video / Audio
Joint Commission Meetings
(PROS) Parks, Recreation and Open Space
Transportation Commission
Other Meetings and Events . Beispiel 2: City of Berkeley
http://www.ci.berkeley.ca.us/ContentDisplay.aspx?id=5838 .
Scheduled Construction Activities for Week of August 15, 2016
Detailed information pertaining to construction projects and related activities within the city.
» Subscribe to this page to receive e-mail notification when new information is posted
-
Sanitary Sewer Rehabilitation Projects
- Sanitary Sewer Rehabilitation
Hopkins St., Peralta Ave., Monterey Ave., The Alameda and Backlines, Boynton Ave and backlines Andes Construction » Project Notice and Maps (.pdf)
The rehabilitation of the existing sanitary sewer mains, manholes and laterals are complete. Continue testing of sanitary sewer main and laterals. Punch list.
Urgent repair of sanitary sewer main at Berkeley High School - pressure tests and concrete placement to encase sanitary sewer main in existing manhole at MLK/Bancroft remain.
- Sanitary Sewer Rehabilitation
Henry, Terrace Walk, Yolo backline, Eunice, Shattuck, Lincoln, Virginia, California, Cedar, Curtis, Gilman, Neilson, Santa Fe, Stannage backline, Cornell backline, Belvedere, Hearst, and 4th Mosto Construction » Project Notice and Map (.pdf)
CCTV point repairs on Oxford and Walnut.
Note: Please DRIVE SLOW thru the construction area. Please obey all "No Parking" signs posted during construction.
- Sanitary Sewer Rehabilitation
Francisco, 5th, Curtis, Delaware, Lincoln, Virginia, Sutter, Henry, Hopkins, and Eunice Pacific Trenchless » Project Notice and Map (.pdf)
Continue rehabilitation of interior manholes by grouting and epoxy sealing on Francisco Street (1100-1200 block) and Delaware Street (1200 block). Continue rehabilitation of sanitary sewer main and laterals on Lincoln Street (1500 block), Francisco Street (1500 block) and Virginia Street (1500 block).
Note: Please heed all "No Parking", temporary directional signs in project area. Please DRIVE SLOW thru the construction area.
-
Street Paving Projects
- FY 2015 Measure M Street Resurfacing and Reconstruction
Various streets throughout Berkeley - See Project Notice or Location Map Gallagher & Burk, Inc. » Location Map (.pdf) » Project Notice (.pdf) » E-mail link to Project Engineer
No scheduled construction activity.
- FY 2015 Measure M Surface Seals
Various streets throughout Berkeley - See Project Notice, Project Map and Street List Telfer Pavement Technologies » Project Notice (.pdf) » Project Map and Street List » E-mail link to Project Inspector » E-mail link to Project Engineer
No scheduled construction activity.
- Street Rehabilitation FY 2016
9th, Belrose, Campus, Claremont Blvd, Codornices, Derby, East Parnassus Ct, Hawthorne Terrace, Heinz, Hilgard, Parker, Piedmont, Piedmont Crescent, Rose, Spruce, Virginia, Warring, West Parnassus Ct Granite Rock Company » Project Notice (.pdf) » E-mail link to Project Engineer » E-mail link to Project Inspector
Pavement milling at:
Campus b/w Avenida and End Virginia at La Vereda Codornices b/w Euclid and End Hawthorne b/w Cedar and Euclid Spruce b/w Cedar and Virginia Heinz b/w 7th and West End 9th b/w Anthony and Ashby
Paving at:
Parnassus b/w Del Mar and Campus E. Parnassus Ct b/w Parnassus and End W. Parnassus Ct b/w Parnassus and End Campus b/w Avenida and End Virginia at La Vereda Codornices b/w Euclid and End Hawthorne Terrace b/w Euclid and Cedar Spruce b/w Cedar and Virginia
Lowering steel throughout project area.
Concrete work at:
Warring/Derby/Belrose/Claremont Blvd corridor Parker/Piedmont Hawthorne Terrace b/w Cedar and Euclid Spruce b/w Cedar and Virginia
-
Sidewalk & Pathway Repair Projects
- FY 2016 Responsive Sidewalk Project
Various locations throughout the city ERA Construction » E-mail link to Project Engineer » E-mail link to Project Inspector
Drainage improvements at Amador Ave.
-
Other
- Flare Station Replacement and Well Field Upgrades
11 Spinnaker Way, Cesar Chavez Park Innovative Construction Solutions » E-mail link to Project Engineer » E-mail link to Project Inspector
Flare demolition and site grading continues through August 19.
-
Parks Projects
- Ohlone Dog Park
1801 Hearst Avenue Redwood Engineering Construction » Project Notice » Postcard
Dog Park Will Be Closed During Construction Other areas of Ohlone Park will not be affected and are planned to remain open.
- Berkeley Rose Garden
1201 Euclid Avenue HM Construction » Project Notice » Postcard
Access May Be Restricted During Construction, see signs posted at the site. Trellis – Closed During Construction Tennis Court 1 (near restroom) – Planned to remain open during construction Tennis Court 2 (next to Court 1) – Planned to remain open during construction Practice Tennis Court – Planned to remain open during construction Tennis Court 3 (northwest corner of the site) – Closed During Construction Tunnel to/from Codornices Park – Closed During Construction Restroom – Access limited during construction
- Grove Park
2828 Martin Luther King Jr. Way Integra Construction Services
Upcoming Project Tennis Courts – will be Closed During Construction Basketball Courts – will be Closed During Construction Restrooms – Access limited during construction, Closed At Times. Other areas of Grove Park, including the Recreation Center, will not be affected and are planned to remain open.
For information on Parks projects, please visit the » Parks Recreation & Waterfront Department.
-
Outside Agencies' Projects
- PG&E
» E-mail link to City contact person
Panoramic Way, Canyon Road - Gas service replacement.
Copper service replacements at ~162 locations throughout the city - Concrete restoration work in progress.
Relocate gas lines ahead of upcoming City valley gutter project at the following locations:
Curtis/Francisco
McGee Ave between Russell and Oregon - Install SCADA.
Restoration work and pole replacement work at various small locations throughout the city.
- EBMUD
» E-mail link to City contact person
Regal/Cragmont - Relocate water mains ahead of upcoming City storm drainage improvement project.
Cornell Avenue from Gilman Street to Hopkins Street - pipeline replacement.
Shattuck/Haste - Night work on August 14, 10PM to 5AM Connect the new pipeline extension for development project on Shattuck to the existing line at the intersection of Shattuck & Haste. Haste Street will be closed to through traffic between Fulton Street and Shattuck Avenue during the night work.
Corona Court/Arch/Oak - Restoration paving pending.
Mabel Street between 66th and Russell - Restoration paving pending.
Heinz Avenue from 7th Street to West end, Tanglewood/Belrose, Prospect/Dwight - Restoration paving.
Restoration work at numerous small areas throughout the city.
Berkeley View Facility Upgrade SE corner of Shasta Road and Hill Road (next to Fire Station #7 on Shasta Road) EBMUD Community Affairs Office, (510) 287-0140, » lluong@ebmud.com After hours, 1 (866) 403-2683 » EBMUD Public Notice (.pdf) » EBMUD Public Notice - June 2015 Update (.pdf)
Replacement of existing pumps, motors, electrical components and internal cranes. Contractor will be using the Shasta Reservoir property at the end of Bay Tree Lane for staging and parking. Construction is now expected to be complete by July 2016.
For updated information and contacts regarding EBMUD Reservoir Replacement and Transmission Pipeline projects please follow the appropriate link below:
» Panoramic Hill Improvements
» Summit Reservoir Replacement Project (Spruce at Grizzly Peak)
» EBMUD Summit Reservoir Notice - December 2014 (.pdf) » Summit Reservoir Update Notice - October 2015 (.pdf)
» Wildcat Pipeline Project
- AT&T Telephone
» E-mail link to City contact person
Crews removing old poles throughout Berkeley. Investigative and cable pulling work within existing manholes and vaults throughout the city.
- Zayo Group
» E-mail link to City contact person
Hearst from MLK to Sacramento, Sacramento from Hearst to Addison, Addison from Sacramento to Acton - Installation of telecommunications facilities.
- Comcast
» E-mail link to City contact person
2526 Durant Avenue - installation of new services in sidewalk area.
Allston Way/West Side of Shattuck Avenue - telecommunications installation
- University of California at Berkeley
Information provided by UC contact person: » Christine Shaff UC Berkeley Real Estate, (510) 643-4793
The Cal Aquatic Center A new intercollegiate aquatic facility located west of the University Health Service Tang Center at 2222 Bancroft Way. It will consist of three single level buildings surrounding a 52 meter swimming pool with dive tower. Construction is expected to be complete in summer 2016.
Berkeley Way West Construction of a new academic building is underway in the lot bounded by Berkeley Way, Shattuck Ave and Hearst Ave. The building will house the School of Public Health, School of Education, and Department of Psychology. Ground floor retail along Shattuck Ave. is also planned. Construction is scheduled to continue through late 2017.
Information about campus construction is available on the web at » realestate.berkeley.edu. Questions or concerns can be addressed to Christine Shaff, UC Berkeley Real Estate, at (510) 643-4793 or» cshaff@berkeley.edu. Other campus resources include the UC Office of Environment Health and Safety at (510) 642-3073.
In all construction areas:
- Please observe all "NO PARKING" signs
- Tie or keep pets away to assure both pet and worker safety
- Keep children out of work area
- Dust and noise will be prevalent, please take proper precautions
If you did not find the project you were looking for, it may have moved to the Recently Completed Projects page.
» Recently completed sanitary sewer projects
» Recently completed storm drain projects
» Recently completed street rehabilitation projects
» Recently completed sidewalk and pathway projects
|
|
|