SFH-141030  Master Plan National Capital Integrated Coastal Development

Colophon The Master Plan of the National Capital Integrated Coastal Development is a joint project by Government of Indonesia and the Government of The Netherlands. The project is financed by the Government of The Netherlands Executing agency is The Coordinating Ministry for Economic Affairs, Indonesia Consultants: Witteveen+Bos Grontmij Kuiper Compagnons Ecorys Triple-A Deltares In association with: Pentair flow technologies Palu2Indonesia Bita Bina Semesta Bita Enarcon Engineering Mr. Martijn Wieriks Photography: Fendi Siregar Inong Hunain Kuiper Compagnons A. Bahrul B.D Witteveen+Bos Grontmij Deltares Illustrations: KuiperCompagnons Clary Sch1

https://sr-indonesia.com/wp-content/uploads/2013/08/Draft-Masterplan-NCICD-LR.pdf

 INTRODUCTION 13
1.1. 2007: A different flood 14
1.2. Main goal 14
1.3. From JCDS to Master Plan 15
2. THE MASTER PLAN 17
2.1. Purpose of this Master Plan 18
2.2. Scope 18
2.3. Composition of this report 19
3. NATIONAL CAPITAL UNDER THREAT 21
3.1. Floods: the motive for this Master Plan 23
3.2. Urban challenges 25
4. INTEGRATED SOLUTIONS 29
4.1. Mission 31
4.2. Approach 31
4.3. Short term no regret measures 31
4.4. Principal long term solutions 35
4.5. Spatial Alternatives 38
5. SAFE AND PROSPEROUS UNDER THE WINGS OF THE GREAT GARUDA 43
5.1. Sea Dike alignment 45
5.2. Concept for spatial development: The Great Garuda 47
5.3. Urban design 49
5.4. Relations with the current coastal zone 53
6. BUSINESS CASE6. BUSINESS CASES 55
6.1. Introduction 57
6.2. A feasible plan 57
6.3. Key factors 58
6.4. Nominal costs and revenues of main components 59
6.5. Results 62
6.6. Economic effects 63
6.7. Risk profile 63
7. THE PLAN PER THEME 67
7.1. Flood safety 69
7.2. Social aspects 73
7.3. Land reclamation 75
7.4. Business and residential 77
7.5. Mainports 81
7.6. Mobility and infrastructure 82
7.7. Water Management 85
7.8. Recreation and green-space 87
7.9. Environmental impacts 91
8. THE PLAN PER AREA 95
8.1. Phase A: Dikes- an opportunity for coastal revitalisation 97
8.2. Phase B: The Great Garuda 99
8.3. Phase C 107
9. TRANSFORMING THE COASTAL ZONE [THE DEVELOPMENT STRATEGY] 109
9.1. Phasing 111
9.2. Implementation strategy 111
Dr6.1. Introduction 57
6.2. A feasible plan 57
6.3. Key factors 58
6.4. Nominal costs and revenues of main components 59
6.5. Results 62
6.6. Economic effects 63
6.7. Risk profile 63
7. THE PLAN PER THEME 67
7.1. Flood safety 69
7.2. Social aspects 73
7.3. Land reclamation 75
7.4. Business and residential 77
7.5. Mainports 81
7.6. Mobility and infrastructure 82
7.7. Water Management 85
7.8. Recreation and green-space 87
7.9. Environmental impacts 91
8. THE PLAN PER AREA 95
8.1. Phase A: Dikes- an opportunity for coastal revitalisation 97
8.2. Phase B: The Great Garuda 99
8.3. Phase C 107
9. TRANSFORMING THE COASTAL ZONE [THE DEVELOPMENT STRATEGY] 109
9.1. Phasing 111
9.2. Implementation strategy 111
Dr

‹zurück Seite Drucken
 

Bereitstellungszeit : 0.254 Sekunden | SQL: 7 | made by powerweb99.at